Ask us anything

Ask about our flues, chimneys, generator exhausts and steelwork, how we work, and the rules and standards for commercial and industrial flues. Grün AI is an automated assistant. If it can’t answer, one of the team comes back to you.

The chat needs JavaScript. Without it, call 01395 201950, email [email protected], or read the common questions below.

Everything Grün AI knows

Common questions

These are the written answers Grün AI gives, grouped by topic. Grün AI is an automated assistant.

What we do

What do you do?

Commercial and industrial flues, chimneys, steelwork and silencers. That means boiler flues, generator exhausts and silencers, chimneys and liners, industrial stacks, process exhaust, support steelwork, and canopies, fans and ductwork, plus testing, surveys and design.

I’m not sure where to start

No problem. We design, supply, install and test flues and exhausts for commercial boilers, generators and other plant. Tell us what the appliance is and where the site is, or send a few photos, and the team will take it from there.

Price checklist Contact page

Do you do the whole package?

Yes. We price design, supply and install as one package, and flues, chimneys, steelwork and silencers can all come from one team under one order. Supply only or install only is fine too.

For estimators

What flue systems do you install?

Twin wall insulated chimneys, insulated exhaust systems with conical or flanged joints, single wall stainless steel flues, and flexible chimney liners. We confirm the exact system for each project.

Do you do boiler flues?

Yes. Flues for gas and condensing boilers, water heaters and CHP: single appliances, cascades into common headers and complete plantroom replacements, designed, supplied, installed and tested.

Boiler flues Boiler flue replacement Water heater flues

Do you do generator exhausts?

Yes. We design and install the exhaust route, silencers and supports together, with silencer sizing calculations and design notes.

Generator exhausts and silencers

What’s in a generator exhaust package?

Route design from plantroom to terminal, silencer sizing and selection, supports, frames and brackets, flexible connections and test tees, insulation and cladding, testing and a certificate, and the O&M pack at handover.

Generator exhausts and silencers

Do you check back pressure and silencer noise?

Yes. The route, silencers and supports are sized against the engine data and the acoustic target, and the sizing note shows the system suits the engine. Send the engine data and a rough route and we’ll price it.

For generator specialists

How do you allow for exhaust expansion?

Exhausts run very hot and grow as they heat up, so the supports have to allow for it. We use insulated exhaust systems with conical or flanged joints, with the steelwork and supports designed with the route.

Data centres and standby generators Generator exhausts and silencers

Can you use an existing chimney?

Often, yes. We can line an existing chimney or plan a new stack, depending on the survey and the appliance.

Can my old chimney be used?

How do you check an old chimney?

We survey it: measure, sketch and photograph the route and check its condition. If you want a flue or condition report, we recommend a CCTV survey down from the top so we can see inside. The survey decides whether it can be lined or needs a new stack.

CCTV flue surveys Can my old chimney be used?

Is lining cheaper than a new stack?

Neither is always cheaper or quicker. It depends on what the survey finds and the appliance going on it.

Can my old chimney be used?

Do you do industrial chimneys and stacks?

Yes. Freestanding chimneys and stacks, guyed stacks and masts, and replacement chimneys for biomass, crematoria and process plant, with insulation, cladding, and cranage and lifting plans.

Industrial chimneys and stacks

Do you do process exhaust?

Yes. Oven exhausts and process extract, furnace and laboratory flues, AHU and extract connections, and CHP and biomass flues, routed, supported, insulated and tested.

Process exhaust Oven and furnace flues Industrial and process

Do you do CHP flues?

Yes. We design, supply, install and test flues for CHP units, on their own or alongside the boiler, water heater and generator flues in the same plantroom.

CHP flues

Do you do biomass boiler flues?

Yes. Flues, masts and stacks for biomass boilers. Our projects include a 2 MW energy centre in Dartford, a flue on a free-standing 13 m mast in Wisbech and a farm boiler house near Canterbury.

Biomass boiler flues Industrial chimneys and stacks

Do you do steam boiler flues?

Yes. Flues and vent stacks for steam boilers. Our projects include steam boiler flues in Preston, Glasgow and Oxford, and replacement vent stacks for a steam boiler house in Derby.

Steam boiler flues

Do you do water heater flues?

Yes. Flues for gas water heaters, on their own or designed and installed with the boiler flues in the same plantroom. There’s no minimum job size.

Water heater flues

Do you do canopies, fans and ductwork?

Yes. Canopies and extract hoods, oven and process canopies, fans, ductwork, supports and plant room ventilation, supplied and installed.

Canopies, fans and ductwork

Do you do support steelwork?

Yes. Flue support steelwork and brackets, channel frames and hangers, plant decks and freestanding masts, designed with the flue. Frames on rubber feet can sit on a flat roof without touching the roof covering.

Steelwork and supports

Do you strip out old flues?

Yes. Strip-out of old flues is part of our boiler flue packages, and old liner removal and strip-out is part of our chimney work.

Boiler flue replacement

Do you do servicing and maintenance?

Yes. We do flue inspections, condition checks, CCTV flue surveys and pressure and smoke testing on flues already in service. Any remedial work is recommended and agreed separately.

Service and maintenance

Do you do supply only?

Yes. We do supply only, install only, or supply and install.

Supply only flue systems

Do you do design only?

Yes. Design and calculations can be ordered on their own, without the install.

What does your design service include?

Flue and silencer sizing calculations, surface temperature checks, fire-rated penetration guidance, CAD plan, front and side views, approval, construction and as-built drawings, and submittals and declarations of performance.

Design and calculations

Who works out the flue size?

We do. We do the calculations, including silencer sizing on generator jobs, and check the design against the current regulations. You don’t need to work out sizes or heights yourself.

Design and calculations

Do you install boilers?

No. We do the flue, chimney and exhaust, not the boiler or generator itself. We design, supply, install and test the flue systems for boilers, generators, CHP, water heaters and industrial plant.

Do you do domestic work?

No. Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.

Is there a minimum job size?

No. There’s no minimum job size, as long as it’s commercial or industrial work.

Price checklist

Where we work and who for

Where do you work?

Across the UK and Ireland. Head office is in Exmouth, Devon, and our engineers are based in the Midlands.

What sectors do you work in?

Schools and colleges, hospitals and healthcare, hotels, data centres and standby generators, defence and government, and industrial and process. Each sector has its own page with the jobs on our project map.

All sectors

Do you work in schools?

Yes. Schools and colleges are 68 of the jobs on our project map. Plant is often only free in the holidays, so it helps that we normally survey within a week of order and install 2 to 4 weeks from order.

Schools and colleges

Do you work in hospitals?

Yes. Boiler flues and standby generator exhausts for hospitals, clinics and care homes, with RAMS written for the actual site and nights and weekends by arrangement.

Hospitals and healthcare

Do you work in hotels?

Yes. We work in hotels that stay open while we work, with job-specific RAMS, a Grün project manager on site, and nights and weekends by arrangement.

Hotels

Do you work on data centres?

Yes. Generator exhausts and silencers for data centres, telephone exchanges and commercial buildings, 40 jobs on our project map, from London to Lerwick. Exchanges and data halls run round the clock, so nights and weekends are by arrangement.

Data centres and standby generators

Do you work on defence and government sites?

Yes. Boiler flues and generator exhausts for RAF stations, government offices and confidential sites. Training is matched to the site, including DBS where needed, so tell us the site’s vetting rules when you enquire.

Defence and government

Do you work on industrial sites?

Yes. Oven, furnace, steam boiler and biomass flues, industrial stacks and process exhaust, 59 jobs on our project map. Production lines run on shifts and shutdowns are short, so nights and weekends are by arrangement.

Industrial and process

Have you worked on farms?

Yes. Our projects include biomass boiler flues on a farm near Canterbury and generator exhausts and silencers at a salmon farm in Applecross.

See our projects

Do you work at airports?

Yes. Our projects include flue survey work at an airport, and the projects page shows the work by site and town.

See our projects Project map

Can I see your projects?

Yes. Our project map has 317 jobs across the UK and Ireland, each dot a finished job, and the projects page has case studies. They show the work by site and town. Jobs we have won or are on site with now are on our news page.

See our projects Project map

Can I see photos of your work?

Yes. Our What it looks like page has real photos from our jobs: roofs and terminals, supports and steelwork, plantroom connections, chimneys and liners, and finishing. The projects page has more by site.

What it looks like See our projects

Prices and quotes

Can you give me a price?

Use Instant quote on this site for a budget guide price, or send drawings, photos or an outline and we normally send a price within 24 hours. The price checklist shows what helps.

Get a price Price checklist

What do you need to price a job?

Drawings, photos or an outline is enough to start. It helps to have: • appliance type and how many • output in kW or kVA • spigot or outlet sizes • rough vertical and horizontal lengths • new flue or existing chimney • termination and site location We price from that or arrange a survey.

Price checklist

What do you need to price a generator exhaust?

The engine data, meaning exhaust flow, temperature and the back pressure limit, plus a rough route. Drawings, photos or an outline is enough to start, and a price normally comes back within 24 hours.

For generator specialists Contact page

Do I need drawings to get a price?

No. Drawings, photos or an outline is enough to start. We price from that or arrange a survey to fill the gaps.

Price checklist

How quickly do you send a price?

We normally send a price within 24 hours of getting drawings or survey information.

What does the online quote tool price mean?

Instant quote shows a flue size and a budget price from rough figures. We confirm everything at survey.

Get a price

What can Instant quote price?

Instant quote covers gas boilers, 1 to 6 on one common flue, and gives a budget price. For generators, CHP or industrial plant, send us drawings and we’ll price from those.

Get a price Contact page

How accurate is the flue calculator?

The flue size in Instant quote is worked out from the figures you enter. We confirm everything at survey, and the final size comes from our full calculations.

Will you price against our usual supplier?

Yes. We’re happy to price as a comparison against your usual supplier.

Get a price

Do you support tender returns?

Yes. We price design, supply and install as one package with the inclusions and exclusions listed, and provide drawings and technical submittals for your tender return.

For estimators

Can you price to our consultant’s spec?

Yes. Send the consultant’s specification with the drawings and plant data, and we’ll tell you what else we need. We confirm the exact system for each project.

Design and calculations

Can you price options or alternatives?

Yes. Our quotes set out the pricing, options and scope clearly, so tell us which alternatives you want priced when you send the drawings.

How we work

Is your quote a fixed price?

Our quotes are based on the information we have and are subject to survey. A price given before a full survey, or before the plant is in, is an estimate, and we firm it up once we have drawings or a survey.

Terms and conditions Get a price

How long is a quote valid for?

Our quotations are open for acceptance for 60 days from the date of issue, unless the quote says otherwise.

Terms and conditions

Are your prices plus VAT?

Our prices are exclusive of VAT, which is charged at the applicable rate.

Terms and conditions

Is testing included in the price?

A smoke test is standard on every flue we install. Pressure testing is done where it’s in the quote or added as a variation, so tell us if your spec needs it.

Flue pressure testing Terms and conditions

Is the terminal included?

Yes. Our boiler flue work runs from the appliance to the terminal, designed, supplied, installed and tested. Each quote lists what’s included and excluded.

Boiler flues

Is fire stopping included?

Fire stopping where the flue passes through fire walls or floors can be priced as an option on the quote.

Is a survey free?

A survey for a quote is free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked. Inspections and CCTV surveys of an existing flue are a separate, charged service.

Book a free survey

Is night and weekend work charged extra?

Nights and weekends are by arrangement. Work outside our standard hours of 08:00 to 16:30, Monday to Friday, is charged at enhanced rates.

Terms and conditions

What if material prices go up?

Quotes are open for 60 days. If steel or other key material costs rise by more than 7% between the quote and us ordering the materials, clause 4.6 of our terms lets us adjust the price for that part of the job.

Terms and conditions

Timescales and hours

What are your normal turnarounds?

Normally a price within 24 hours of drawings or survey information, a survey within a week of order, calculations and drawings within 60 minutes of survey, RAMS the same day, and install 2 to 4 weeks from order.

How we work

How soon can you survey?

We can normally survey within a week of an order. To have a site looked at before you order, book a free survey and we’ll call to agree the date.

Book a free survey

Can I book a survey?

Yes. Book a free survey online: tell us about the job and the site, and pick up to three dates, morning or afternoon. It’s free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.

Book a free survey

How fast are drawings?

Calculations and CAD drawings are normally back within 60 minutes of the survey.

How quickly do you do RAMS?

RAMS are written for the actual job and site, and normally turned around the same day.

What is your lead time?

Normally 2 to 4 weeks from order to install, and faster for urgent jobs.

How we work

Do you provide a programme?

Yes. Once the job is ordered, materials and access are lined up with the programme and you get programme and logistics information. Install is normally 2 to 4 weeks from order, faster when it is urgent.

How we work For project managers

What are your opening hours?

The office is open Monday to Friday, 8am to 5pm. Call 01395 201950 in those hours, or ask here any time and the team will pick it up.

What are your working hours?

Our standard site hours are 08:00 to 16:30, Monday to Friday. Nights and weekends are by arrangement.

Do you work nights and weekends?

Yes. Nights, weekends and bank holidays are by arrangement.

Do you do emergency call-outs?

We take on urgent work by arrangement. Call 01395 201950.

Surveys and on site

Do you survey?

Yes. We measure, sketch and photograph the route, and that feeds the drawings and RAMS. We also do flue inspections, condition checks and CCTV flue surveys, normally from the roof terminal down.

Book a free survey CCTV flue surveys What happens on a flue survey

How long does a survey take?

Allow up to two hours on site for the engineer. Calculations and CAD drawings normally follow within 60 minutes of the survey.

What happens on a flue survey

How do I get ready for a survey?

Have the plant in its final position, allow up to two hours, and give us access to the plantroom, riser and roof with a named contact on site. Tell us about site rules, inductions or permits, and anything going in later that could block the flue route.

What happens on a flue survey

What if the plant isn’t in place for the survey?

It helps to have the plant in its final position for the survey. If it isn’t, the route, lengths or supports may need to change once it’s in, and the price and programme can change with them.

What happens on a flue survey

Can we cancel or move a site visit?

Yes, but please give at least 48 working hours’ notice, not counting weekends and bank holidays. Late cancellations can be charged, as set out in our terms of sale.

Terms and conditions

What happens once we place an order?

We acknowledge the order, set the job up and share a project folder with you. Then survey, calculations and drawings, RAMS, materials, install with daily photo reports, testing, and the handover pack in your folder.

How we work What to expect

Will we get a job reference?

Yes. Your enquiry is registered the same day with a job reference. Grün job numbers start with GE.

How we work

Who runs the job on site?

Every job has a Grün project manager on site.

Do you use your own engineers?

Yes. Our price is for our own team to install, with a Grün project manager on site.

What do I need to provide on site?

We need welfare facilities and the appliances isolated when we need them. We sort everything else, and access equipment such as MEWPs can be added to the quote as an extra.

Who provides scaffolding and access?

We can arrange towers, MEWPs, scaffold and cranage where needed and add them to the quote as an extra. If they aren’t in our quote, they’re provided by you.

How are materials delivered?

Materials are delivered to site at ground level unless agreed otherwise. Offloading and safe storage on site are by you, unless the quote says otherwise.

Terms and conditions

What if the site isn’t ready when you arrive?

If we get to site and can’t work because it isn’t ready, or access, permits, inductions or welfare aren’t in place, the time can be charged as abortive or standby under clause 7.4 of our terms. If the date needs to move, give us at least 48 working hours’ notice.

Terms and conditions

What if the route or scope changes?

Any change to the route or scope needs agreeing in writing and covering by a variation or order before we do the extra work. Variations are priced and agreed before they’re done.

Terms and conditions

Do you send progress updates?

Yes. You get a daily photo report from site while we are installing.

Do you leave the site tidy?

Yes. The site is left tidy, with end caps and rod caps on the fixings, and our engineers work in branded PPE.

What it looks like

Do you handle building control or chimney height approval?

We provide the calculations and drawings needed. The application itself is submitted by you or your consultant.

Testing, documents and handover

What testing do you do?

Pressure testing with a test report, smoke testing and CCTV surveys. Each job includes the testing agreed for the project, with test reports and a certificate of conformity where applicable.

Flue pressure testing Testing, inspection and surveys

Do you pressure test generator exhausts?

Yes. The exhaust is pressure tested on completion, so the site knows it’s sealed before the generator runs on load. You get a test report, and a certificate of conformity where applicable.

Flue pressure testing Data centres and standby generators

How do you check your work before handover?

A supervisor inspects every project as part of our snagging and passing-off procedure, and the system is tested before handover, with a test report and a certificate of conformity where applicable.

Why contractors use Grün Accreditations

What documents do I get?

Calculations, drawings, technical submittals, job-specific RAMS, daily photo reports, test reports, and a completion report with photos and an O&M pack. Handover documents are normally in your project folder before the engineers get home.

The paperwork at the end

What’s in the O&M pack?

System details, drawings, test reports and maintenance guidance, for whoever looks after the flue from now on. Give it to the facilities team or the building owner, and keep the test report and completion report with it.

The paperwork at the end

When do we get the test report?

Test reports, and the certificate of conformity where applicable, come after testing. The completion report, photos and O&M pack go in your project folder at handover, normally before the engineers get home.

The paperwork at the end

Where are the test certificate and O&M pack for a job you did?

Test reports, any certificate of conformity, the completion report and the O&M pack go into your shared project folder. If you can’t find them, email [email protected] with your Grün job number, which starts with GE.

The paperwork at the end

Do I get a report I can pass on?

Yes. After the survey you get a report of what we found, with photos you can pass to your client or the building owner. If you want a flue or condition report on an old chimney, we recommend a CCTV survey from the top.

For facilities managers

Can I see sample documents?

Yes. Our downloads page has a sample RAMS, a sample handover pack and a sample test certificate, from real jobs with client details blacked out.

Downloads

Problems with an existing flue

A CO alarm has gone off

If a carbon monoxide alarm goes off or you smell gas or fumes, get everyone out into fresh air, turn the appliance off if it’s safe to, and call the National Gas Emergency number on 0800 111 999. If anyone feels unwell, call 999. Then call us on 01395 201950.

Common flue faults

Generator fumes are getting in

Get everyone out into fresh air and stop the generator if it’s safe to. If anyone feels unwell, call 999. Don’t run it again until the exhaust has been checked, and call us on 01395 201950.

There’s a problem on one of your jobs today

Call the office on 01395 201950 so the team can sort it out with the Grün project manager on the job. There’s no call centre.

Is our flue safe?

I can’t judge that from here. If you think it isn’t safe, call 01395 201950. Where it isn’t safe, we make it safe on the day and then put it right.

Common flue faults

What flue faults do you find?

The common ones are leaking joints and failed seals, no fall on horizontal runs, staining round penetrations, terminals in the wrong place, rust and cracked weathering, failed brackets, failed insulation and dropped inner liners. Our flue faults page has photos of each.

Common flue faults

Why is our flue leaking or stained?

Staining or water at a joint usually means condensate and flue gas are getting out, and on long horizontal runs it is often because there is no fall back to a drain. We survey it, put right the failed sections, seals or falls, then pressure test and give you a test report.

Flue repairs Common flue faults

There’s rust on our flue. Is that a problem?

Rust spots on stainless steel mean something is attacking it, and cracked sealant at a wall or roof plate lets rain in behind the cladding. We replace corroded sections, refit wall plates and weathering, and inspect the rest of the run.

Common flue faults

The flue brackets look damaged. Is it safe?

Brackets carry the weight of the flue and the wind load on it, so if they distort or shear the flue can move, pull apart at the joints or fall. If it isn’t safe we make it safe on the day, then replace the brackets and supports. For urgent work call 01395 201950.

Common flue faults

Why is the outside of our flue hot?

On a twin wall flue that usually means the insulation has broken down, which also makes more condensate form inside. It can’t be repaired inside the section, so we replace the affected sections with new twin wall insulated ones.

Common flue faults

Why are flue gases getting back into the building?

A terminal tucked low behind a parapet can let flue gas hang around and get back in through vents or windows. We check the terminal on survey and extend or re-route the flue. If you can smell fumes now, get everyone out into fresh air and call the National Gas Emergency number on 0800 111 999.

Common flue faults

Water is getting in where the flue goes through the roof

Staining or water round a flue where it passes through a roof, wall or floor means water or condensate is getting past it, and cracked sealant at a roof or wall plate lets rain in. We trace it, normally with a CCTV survey from the terminal down, then reseal or replace the section and weathering.

Common flue faults

The inner liner has dropped. What does that mean?

The inner liner and outer casing should sit level. When the liner drops, the joints open up inside where you can’t see them. We replace the affected sections and check the rest of the flue from the top and with CCTV.

Common flue faults

Is steam from the flue normal?

A visible cloud from the terminal is mostly water vapour, common from condensing boilers in cold weather. Where it drifts matters near windows, vents and walkways, so if you’re unsure, send photos to the team.

Flue glossary

Something is blocking our flue

A CCTV survey shows blockages and debris inside a flue, and some terminals have a cap or mesh to keep out rain, birds and leaves. Send the site and any photos and we’ll arrange a survey.

Testing, inspection and surveys

The boiler cuts out when it’s windy

Wind can push flue gases back down a flue, which is called downdraught, and terminal position and height help avoid it. We check the terminal on every survey, so send the site address and photos and we’ll take a look.

Common flue faults Flue glossary

Our flue failed its service. What do we do?

Send us the site address, the appliance and any photos. We survey it, normally with a camera from the terminal down, report what we find with photos, price the repair or replacement, then fit, test and certify it with our own engineers.

CCTV flue surveys Flue repairs Common flue faults

Can you repair a flue or does it need replacing?

Either. We repair failed sections, seals, brackets, liners and terminals, or fit a new system where it’s past saving. The survey decides which.

Flue repairs Common flue faults For facilities managers

How do I report a problem with a flue you installed?

Call 01395 201950 or email [email protected] with your Grün job number, what you have found and photos if you can.

Warranty

What warranty do you give?

12 months on our workmanship, plus the manufacturer’s warranty on the materials. No inspection is needed in the first year, but the installation must be registered within 30 days of practical completion.

Register a warranty

How do I register my warranty?

Register online on our warranty page within 30 days of practical completion, or download the paper form and email it to [email protected]. Your Grün job number starts with GE and is on the handover pack.

Register a warranty

Can the warranty be extended?

Yes. An annual Grün service and inspection extends the workmanship warranty to 12 months from that service, up to 5 years from practical completion, and without one it ends 12 months after practical completion. Services are charged at our rates at the time.

Register a warranty

What does the warranty not cover?

Misuse, neglect or lack of maintenance, damage by other trades, impact or outside events, and changes made by others without our agreement. Full terms are in clause 10 of our terms and conditions of sale.

Register a warranty Terms and conditions

Does the warranty cover materials?

The materials are covered by the manufacturer’s warranty. Our 12 months covers our workmanship.

Register a warranty

What if the warranty wasn’t registered in time?

If the installation isn’t registered within 30 days of practical completion, the workmanship warranty doesn’t apply. If you think yours has been missed, send the details to the team.

Register a warranty

Do you give a fitness for purpose warranty?

No. We use reasonable skill and care and install systems that meet the applicable standards and the manufacturers’ recommendations, but we don’t give a fitness for purpose warranty beyond that (clause 13.6).

Terms and conditions

Terms and payment

What are your payment terms?

Standard payment terms are 30 days from the date of our invoice, unless agreed otherwise in writing. The details are in clause 12 of our terms and conditions of sale.

Terms and conditions

When do you invoice?

Unless the quote says otherwise, supply-only orders are invoiced on or after delivery, and design and install jobs monthly in arrears for the work done. Payment is due 30 days from invoice.

Terms and conditions

Can you use our payment portal?

Yes. If applications have to go through a payment portal, there’s an admin charge per application plus any portal charges, as set out in clause 12.7 of our terms of sale.

Terms and conditions

Do you accept pay when paid?

No. We don’t accept pay when paid or pay if paid. Payment to us isn’t conditional on you being paid, as clause 12.6 of our terms of sale sets out.

Terms and conditions

What is the longest payment term you accept?

Standard terms are 30 days from our invoice. We don’t accept terms longer than 60 days end of month unless a director agrees it in writing, under clause 12.4 of our terms of sale.

Terms and conditions

Do you take retention?

We don’t ordinarily agree to retention. If it is agreed, it has to be in writing, and clause 12 of our terms of sale sets out how it works.

Terms and conditions

Do you accept liquidated damages?

Not unless they are agreed in writing in our quotation and priced for, as clause 13.5 of our terms of sale sets out.

Terms and conditions

Whose terms apply to the order?

Our quotations, orders and invoices are on our terms and conditions of sale. Other terms only apply if a Grün director agrees them in writing, under clauses 2.5 and 2.6.

Terms and conditions

What if we cancel an order?

If an order is cancelled after design has started, a design fee is due, plus a survey fee if we’ve surveyed. Once bespoke materials are ordered, those are charged too. Clause 11 of our terms sets it out, and the fees are available on request.

Terms and conditions

What is your liability?

Our liability is limited as set out in clause 13 of our terms of sale, and we aren’t liable for indirect or consequential loss such as loss of profit or production. For anything specific, send it to the team.

Terms and conditions

Can we share your drawings and prices?

Our designs, drawings, calculations and prices are confidential and stay ours. You can use them for your project, but not to get competing quotes from others without our written agreement (clauses 6.7 and 14).

Terms and conditions

Will you sign an NDA?

Our terms of sale already treat drawings, prices and documents on both sides of a job as confidential. For a separate NDA, send it to the team.

Terms and conditions

How are disputes handled?

Clause 17 of our terms sets it out: first between the project managers, then between directors if it isn’t settled in 14 days, then adjudication under the Construction Act if needed.

Terms and conditions

Where are your terms and conditions?

Our terms and conditions of sale are on the terms page, and as a PDF on our downloads page.

Terms and conditions Downloads

Accreditations, insurance and standards

What accreditations do you hold?

Constructionline Gold (1400487), SafeContractor (NR5256) and Once For All SSIP (1400487). All three renew in January and February 2027.

Accreditations

Can I download your certificates?

Yes. The Constructionline Gold, SafeContractor and Once For All certificates are on our downloads and accreditations pages.

Downloads Accreditations

What insurance do you hold?

Employer’s liability £10 million, public and products liability £5 million and professional indemnity £2 million, all running to February 2027. We also hold contractors’ all risks insurance. For a copy of a certificate, send the request to the team.

Terms and conditions

Do you have professional indemnity insurance?

Yes. Professional indemnity cover is £2 million and runs to February 2027. For a copy of the certificate, send the request to the team.

Terms and conditions

Do you have a health and safety policy?

Our health and safety is assessed through SafeContractor and Once For All, both SSIP schemes, and Constructionline Gold checks our company, health and safety and other policies. The certificates are on our accreditations page.

Accreditations

Can you fill in our PQQ?

Constructionline Gold is there so buyers don’t have to run their own pre-qualification, and our certificates are on the accreditations page. If you still need a form filled in, send it to the team.

Accreditations Downloads

What standards do your designs follow?

Flue calculations follow BS EN 13384. Where relevant we also work to BS 6644, IGEM/UP/10 and Building Regulations Part J. We confirm the standards that apply to each project.

What training do your engineers have?

Training is matched to the role and site. It includes CSCS, IPAF, PASMA, SSSTS and asbestos awareness, with DBS checks for sites that need them.

Do you have a capability statement?

Yes. There’s a one-page capability statement on our downloads page, plus one-page summaries for directors, estimators, project managers, facilities managers and generator specialists.

Downloads

Regulations and standards

What regulations apply to commercial flues?

Several, depending on the plant. Part J of the Building Regulations, with Approved Document J in England, and building control sign-off. BS EN 13384 for sizing, BS EN 15287 for design and installation, and BS EN 1856 for metal chimney products. For gas plant over 70 kW net, BS 6644 and IGEM/UP/10. Chimney height approval under the Clean Air Act 1993 for bigger plant, and an environmental permit for plant of 1 MW thermal input or more. This is general guidance. Your designer or building control confirms what applies on your job.

Design and calculations

What is Approved Document J?

Approved Document J is the government guidance on Part J of the Building Regulations in England. It covers the air supply to combustion appliances, getting the products of combustion safely outside, and protecting the building from heat and fire. The current edition is the 2010 edition incorporating the 2010, 2013 and 2022 amendments. Wales publishes its own Approved Document J. This is general guidance. Your designer or building control confirms what applies on your job.

Does Part J cover large commercial boilers?

Not fully. Approved Document J’s guidance (2010 edition, amended 2022) is written for smaller installations, for example gas appliances up to 70 kW net rated input and oil appliances up to 45 kW output. Part J’s requirements still apply above that, and the document says larger installations may be shown to comply using practice standards from BSI and IGEM. For commercial gas plant those are BS 6644 and IGEM/UP/10. This is general guidance. Your designer or building control confirms what applies on your job.

Do I need building control for a new commercial flue?

Usually, yes. Approved Document J (2010 edition, amended 2022) says that, in general, all work on a combustion appliance that isn’t a repair or maintenance is notifiable, and providing a new or replacement flue liner counts too. The work is notified to a building control body, unless it’s done by an installer registered with a competent person scheme that covers it, who self-certifies. We provide the calculations and drawings for the application. This is general guidance. Your designer or building control confirms what applies on your job.

Do I need chimney height approval?

You do if your plant is big enough. Under section 14 of the Clean Air Act 1993, a furnace burning pulverised fuel, solid fuel at 45.4 kg an hour or more, or liquid or gas at 366.4 kW or more, can’t be used unless the local authority has approved the chimney height. The same applies to fixed boilers and industrial plant unless they are exempted. The application goes to the local authority, and we provide the calculations and drawings for it. This is general guidance. Your designer or building control confirms what applies on your job.

How does chimney height approval work?

The local authority can only approve the height if it’s satisfied it will, as far as practicable, stop the emissions being harmful to health or a nuisance, looking at the plant, nearby buildings and ground levels (Clean Air Act 1993, section 15). If it doesn’t decide within four weeks, or a longer period agreed in writing, approval is treated as given. A refusal must give reasons and the lowest height it would approve, and you can appeal within 28 days. Defra’s air quality pages point to the Chimney Heights Memorandum (third edition, 1981), which is not statutory, and say larger boilers need a more detailed assessment with a dispersion model. This is general guidance. Your designer or building control confirms what applies on your job.

Does the Clean Air Act limit what fuel we can burn?

In a smoke control area it can. Under the Clean Air Act 1993 it’s an offence to emit a substantial amount of smoke from a building’s chimney there, and to acquire an unauthorised fuel for use there. That matters most for solid fuel and biomass plant. Your local authority can tell you if the site is in a smoke control area. This is general guidance. Your designer or building control confirms what applies on your job.

What standard is used to size a flue?

Flue and chimney sizing calculations are done to BS EN 13384. Part 1 (BS EN 13384-1:2015+A1:2019) covers a chimney serving one appliance and Part 2 (BS EN 13384-2:2015+A1:2019) covers a chimney serving more than one, such as a boiler cascade. Both cover negative and positive pressure, and wet and dry operation. Our flue calculations follow BS EN 13384. This is general guidance. Your designer or building control confirms what applies on your job.

Design and calculations

What is BS EN 15287?

BS EN 15287 covers the design, installation and commissioning of chimneys and connecting flue pipes. Part 1 (BS EN 15287-1:2023) is for non-room-sealed appliances and Part 2 (BS EN 15287-2:2023) is for room-sealed appliances. It covers system chimneys, custom-built chimneys, relining existing chimneys, labelling and commissioning. This is general guidance. Your designer or building control confirms what applies on your job.

What is BS EN 1856?

BS EN 1856 is the product standard for metal chimneys. Part 1 (BS EN 1856-1:2009) covers system chimney products, single and multi-wall with rigid metal liners, up to 1200 mm diameter. Part 2 (BS EN 1856-2:2009) covers metal flue liners and connecting flue pipes, including flexible liners for relining existing chimneys. Free-standing chimneys are outside Part 1. This is general guidance. Your designer or building control confirms what applies on your job.

What does a chimney designation mean?

A designation is the code that says what a chimney product is rated for, using the scheme in BS EN 1443 (BS EN 1443:2019 is current). Approved Document J (Appendix G) explains it with an example like T450 N2 D 1 G50: the temperature class, the pressure class, W for wet or D for dry, the corrosion resistance class, and G or O for soot fire resistance with the distance to combustible material in millimetres. The product’s designation has to suit the appliance and the fuel. This is general guidance. Your designer or building control confirms what applies on your job.

What does H1 mean on a flue?

H1 is a pressure class from the BS EN 1443:2019 designation scheme. N classes are for natural draught chimneys working under negative pressure, P classes for positive pressure such as fan-assisted appliances, and H classes for high positive pressure such as diesel generators. The number is the leakage class, and 1 is tighter than 2. Approved Document J (Appendix G, Table G2) gives the test pressures: 40 Pa for N1, 20 Pa for N2, 200 Pa for P1 and P2, and 5000 Pa for H1 and H2, with P1 and H1 allowing a leakage of 0.006 litres a second per square metre. This is general guidance. Your designer or building control confirms what applies on your job.

Flue pressure testing

Does a condensing boiler need a wet-rated flue?

In the BS EN 1443:2019 designation scheme, W means the product can contain condensate within the flue and D means it is for dry operation. Approved Document J (Appendix G) says W products are aimed at condensing appliances. The designer picks the designation that suits the appliance. This is general guidance. Your designer or building control confirms what applies on your job.

What do G and O mean in a flue designation?

G means the product is soot fire resistant and O means it isn’t. Approved Document J (2010 edition, amended 2022, Appendix G) says a G product has been tested at 1000°C for 30 minutes, and the number after the letter is the distance to combustible material in millimetres. BS EN 1443 says whether soot fire resistance is needed depends on the fuel type. This is general guidance. Your designer or building control confirms what applies on your job.

What is IGEM/UP/10?

IGEM/UP/10 is the Institution of Gas Engineers and Managers standard for installing flued gas appliances in industrial and commercial premises. The current version is Edition 4 with amendments (2016 and 2017). It covers hot water boilers over 70 kW net up to 20 MW, and other flued plant such as steam boilers and warm air heaters, and gives design information for flues, chimneys and ventilation. It doesn’t cover process plant. This is general guidance. Your designer or building control confirms what applies on your job.

What is BS 6644?

BS 6644:2011 covers installing, commissioning and maintaining gas-fired hot water boilers from 70 kW net up to 1.8 MW net, including groups of smaller boilers that add up to more than 70 kW. It’s used alongside IGEM/UP/10 for commercial boiler plant, and covers things like the flue, ventilation and the boiler room. This is general guidance. Your designer or building control confirms what applies on your job.

Which standard applies to gas boilers over 70 kW?

Above 70 kW net, the main documents are BS 6644:2011 for hot water boilers up to 1.8 MW net, and IGEM/UP/10 Edition 4 (with 2016 and 2017 amendments) for flued gas appliances in industrial and commercial premises up to 20 MW. Approved Document J’s gas guidance stops at 70 kW net. The flue itself is sized to BS EN 13384. This is general guidance. Your designer or building control confirms what applies on your job.

Does BS 5440 apply to commercial flues?

Only to smaller gas appliances. BS 5440-1:2023 covers chimneys for gas appliances of up to 70 kW net each, open-flued and room-sealed, and BS 5440-2 covers their ventilation. Above 70 kW net, BS 6644 and IGEM/UP/10 are the usual documents. This is general guidance. Your designer or building control confirms what applies on your job.

Do the gas safety regulations cover flues?

Yes. Under regulation 35 of the Gas Safety (Installation and Use) Regulations 1998, every employer or self-employed person must make sure any gas appliance, installation pipework or flue at a place of work under their control is maintained in a safe condition. Rented homes have their own yearly safety check under regulation 36. This is general guidance. Your designer or building control confirms what applies on your job.

Who is responsible for maintaining a commercial flue?

For gas plant, the employer or self-employed person in control of the place of work must keep the flue in a safe condition (Gas Safety (Installation and Use) Regulations 1998, regulation 35). Part J also asks for a durable notice by the flue saying what it is suitable for, and in Ireland the owner must be given information on the system and the maintenance it needs. This is general guidance. Your designer or building control confirms what applies on your job.

Service and maintenance

What is the MCPD?

The Medium Combustion Plant Directive covers combustion plant of 1 MW to under 50 MW rated thermal input, such as boilers, engines and turbines, with permits and emission limits. In England and Wales it’s done through environmental permits from the Environment Agency or Natural Resources Wales. New plant needs a permit before it’s commissioned, existing plant over 5 MW needed one by 1 January 2024, and existing plant of 1 MW to 5 MW needs one by 1 January 2029. This is general guidance. Your designer or building control confirms what applies on your job.

What is a specified generator?

Under the environmental permitting guidance for England and Wales (GOV.UK, updated September 2022), a specified generator is one or more generators of electricity on the same site, run by the same operator for the same purpose, generally of 1 MW to 50 MW thermal input. A backup generator used only during an on-site emergency is excluded, but it is still medium combustion plant and may need a permit, and testing is limited to 50 hours a year for each backup generator unless the regulator agrees in writing. This is general guidance. Your designer or building control confirms what applies on your job.

What about permits in Scotland and Northern Ireland?

In Scotland, medium combustion plant of 1 MW to 50 MW, including back-up and standby generators, is regulated by SEPA under the Pollution Prevention and Control (Scotland) Regulations 2012. In Northern Ireland it’s under the Pollution Prevention and Control (Industrial Emissions) Regulations (Northern Ireland) 2013, with permits from the NIEA or the district council depending on the site. This is general guidance. Your designer or building control confirms what applies on your job.

What is a declaration of performance?

A declaration of performance (DoP) is a document the manufacturer draws up for a construction product covered by a designated standard. It is mandatory when the product is placed on the market in Great Britain (trading standards guidance, November 2024) and goes with the CE or UKCA mark, and importers must check the marking and the DoP are right. Our submittals include the declarations of performance for the system. This is general guidance. Your designer or building control confirms what applies on your job.

Are there rules on where a flue terminal can go?

Yes. Approved Document J (2010 edition, amended 2022) says the outlet has to let the products of combustion disperse, and for gas appliances up to 70 kW net its Diagram 34 and table give minimum distances from things like openings, gutters and corners. For larger gas plant, IGEM/UP/10 gives design information for flues and chimneys, and plant over the Clean Air Act thresholds needs chimney height approval from the local authority. This is general guidance. Your designer or building control confirms what applies on your job.

What standard covers free-standing steel chimneys?

Free-standing, or structurally independent, chimneys are outside BS EN 1856-1 and BS EN 1443. They’re covered by the BS EN 13084 series for free-standing chimneys, and BS EN 13084-7:2012 is the product standard for the cylindrical steel parts of single wall steel chimneys and steel liners, including their insulation and cladding. This is general guidance. Your designer or building control confirms what applies on your job.

Industrial chimneys and stacks

What standard covers plant room ventilation for gas boilers?

For gas boiler plant over 70 kW net, ventilation is covered by BS 6644:2011 (boilers up to 1.8 MW net) and IGEM/UP/10 Edition 4 (with 2016 and 2017 amendments). For gas appliances up to 70 kW net it’s BS 5440-2. Gas engines and gas turbines have their own IGEM documents, IGE/UP/3 and IGE/UP/9. This is general guidance. Your designer or building control confirms what applies on your job.

Does a flue need commissioning?

Yes, an installed chimney is checked before it’s used. BS EN 15287-1:2023 and BS EN 15287-2:2023 give information on commissioning an installed chimney, and Approved Document J (Appendix E) has checklists for new flues, including a visual inspection and a smoke test for gas-tightness. This is general guidance. Your designer or building control confirms what applies on your job.

About Grün and getting in touch

How do I get in touch?

Call 01395 201950 or email [email protected]. Grün Engineering Limited, Exmouth Business Centre, 14 Hartley Road, Exmouth, Devon EX8 2SG.

Can I contact you without phoning?

Yes. Email [email protected] and the team will reply by email. You can attach drawings and photos too.

Contact page

How do I send you drawings?

Use the Send drawings form on our contact page, which takes several files, or email them to [email protected]. Everything sent goes to the same place.

Contact page

What are your company details?

Grün Engineering Limited, registered in England and Wales, company number 15797358. You can also find us on LinkedIn.

Grün on LinkedIn

Who runs Grün?

Thomas Meakin is the director, and the rest of the team is on our About page.

About and team

How long have you been going?

Our key staff have 50 years of combined industry experience, and the jobs on our project map are jobs our team has delivered. Company details are on the Companies House register under company number 15797358.

About and team Project map

Why use Grün?

A price normally within 24 hours, drawings within 60 minutes of survey, RAMS the same day, every job on a public map, and sample paperwork you can download before you order. Our Why Grün page links to each one.

Why contractors use Grün How to choose a flue contractor

Who is in the team?

The team on our About page: Thomas Meakin (Director), Heather Rathbone (Estimating Manager), Chris Meakin (Sales Manager), Nathan Lawley (Senior Lead Engineer) and Finlay Harris (Trainee Installation Engineer). Call 01395 201950 or email [email protected] to reach them.

About and team

Have you got any guides?

Yes. Our guides cover what we need to price your flue job, what happens on a flue survey, whether an old chimney can be used, the paperwork you get at the end, and how to choose a flue contractor. There’s also a flue glossary of the words on drawings, quotes and site.

All guides How to choose a flue contractor Flue glossary

Can I join your mailing list?

Yes. You can join the mailing list on our contact page, and sign up for new guides by email on the downloads page.

Contact page Downloads

What do you do with my data?

We use your details to reply, price and plan your job and keep records, and we don’t sell your data. To ask for a copy, a correction or deletion, email [email protected] and we’ll reply within one month.

Privacy notice

Do you use cookies?

Our cookie notice explains what we use. Analytics and advertising cookies are only used if you agree to them.

Cookie notice Privacy notice

Careers

Are you hiring?

Yes. Our careers page has four roles: flue fitter or installer, contracts manager, operations lead and sales engineer. Each one says what it involves and what we expect, and you apply on the same page.

Careers and roles

Do I need flue experience?

Not for the trainee, improver or second man role. A practical background helps, and we pay for the training and tickets you need. Head fitters need experience installing flues, chimneys, ductwork or similar on commercial sites.

Careers and roles

What does the trainee role involve?

Working alongside a head fitter, learning setting out, fixing, supports, testing and handover, and working towards running jobs yourself. No flue experience needed. It pays up to £18.50 an hour, full time.

Careers and roles

What does the head fitter role involve?

Installing flues, generator exhausts, chimneys, liners and supports on commercial sites, running the job with a second man, testing before sign-off and sending a photo report each day. It pays £25 an hour to start and £28 once proven, full time.

Careers and roles

What does the surveyor role involve?

It’s full time on sites across the UK and Ireland: measuring, sketching and photographing flue routes, recording appliance details and access, and doing inspections and CCTV flue surveys. For pay, talk to us.

Careers and roles

What do you look for in a surveyor?

Experience surveying or installing flues, ductwork, HVAC or similar, careful measurements and thorough photos, safe working at height, and a full driving licence. The role includes inspections, condition checks and CCTV flue surveys.

Careers and roles

What does the contracts manager role involve?

Running several flue, chimney and steelwork jobs at once from order to handover: survey, RAMS, materials, engineers, the main contractor, testing and the handover pack. It’s full time, with a company van, and pay is by discussion.

Careers and roles

What do your jobs pay?

Head fitters get £25 an hour to start and £28 once proven. Trainees, improvers and second men get up to £18.50 an hour. For the surveyor and contracts manager roles, talk to us about pay. Overtime and travel are paid.

Careers and roles

What do you offer staff?

A company pension, a Christmas bonus, an employee assistance programme, paid training and tickets, free PureGym membership and incentives to eat well and train. Site roles get a company van and fuel card, hotels and a food allowance when away, and uniform, PPE and tools.

Careers and roles

Are the jobs full time?

Yes. All four roles are full time.

Careers and roles

Where would I be based?

The work is on sites across the UK and Ireland, and our engineers are based in the Midlands.

Careers and roles

Do I need to work away?

Sometimes. Our sites are across the UK and Ireland, and the fitter and trainee roles ask that you’re happy to work away and stay overnight when the job needs it.

Careers and roles

Do I need a driving licence?

Yes. Every role on our careers page needs a full UK driving licence.

Careers and roles

How do I apply for a job?

Use the form on our careers page: pick a role, or Something else, and tell us how you can help Grün or what you’d bring. A CV is optional. Then there’s a call with us and a paid trial day. Applications are confidential and you hear back either way.

Careers and roles

Is my application confidential?

Yes. Only Thomas Meakin, our MD, reads applications. Everything is confidential, we never contact your current employer, and you hear back either way.

Careers and roles