Our work in Scotland

19 jobs so far, in Prestwick, Applecross, Inverness, Lerwick, Grangemouth and more. Grouped by service below.

This page counts the 19 jobs whose address is in this area. The Scotland button on our project map shows 18, because the map groups jobs by map zone.

Boiler flues

Nine jobs. Two are shown here with photos. The rest are on the project map.

About boiler flues
New stainless flue header on drop rods over three boilers in a school plantroomMoray Primary SchoolGrangemouthBoiler flue
New stainless exhaust connection and weathering cone into an existing steel stack at an airfieldHMS GannetPrestwickBoiler flue

Other work

One job. Surveys, repairs, supply only and jobs still being classified

Coverage

How we cover Scotland

Our engineers travel to Scotland from their base in the Midlands. We normally survey within a week of an order. Head office is in Exmouth, Devon. Every job on this page is one our team has delivered in Scotland, with the site, town and system shown.

What we did

The work, job by job.

  • Applecross salmon farm: generator exhausts

    Four separate Ø400 routes with test points and tee caps, grouped through the roof onto cantilever brackets. We did all the silencer work: the silencer design, fitting the silencers and all the steelwork that supports them, plus all the access and scaffolding. The silencers sit on frames we made over the generator sets, lifted in with the lifting team on site.

    Case study
  • Dunblane Street, Glasgow: flue installation

    We installed the flue systems at Dunblane Street in Glasgow, working to the flue drawings supplied for the job. Inside, the flues run at high level alongside cable trays and pipework, hung on drop rods and strut, then drop down to the appliances.

    Case study
  • Applecross salmon farm, additional works: generator exhausts

    Four separate Ø400 routes with test points and tee caps, grouped through the roof onto cantilever brackets. We did all the silencer work: the silencer design, fitting the silencers and all the steelwork that supports them, plus all the access and scaffolding. The silencers sit on frames we made over the generator sets, lifted in with the lifting team on site.

    Case study
  • Boiler Plant Upgrade Moray PS: boiler flue

    A new boiler flue for the plant upgrade at Moray Primary School in Grangemouth. A stainless header on drop rods collects the flues from the boilers and runs across the plant room to the existing chimney stack.

    Case study
  • Glasgow Prestwick Airport: boiler flue

    Our team delivered the boiler flue at Glasgow Prestwick Airport. In the photograph: stainless flue running up the inside wall of a steel-clad industrial building.

    Case study
  • HMS Gannet 172: boiler flue replacement

    A flue replacement in the boiler house at HMS Gannet, at Prestwick airfield in Scotland. We cut out the old cast steel flue and put in a new twin wall system in its place, through the wall and into the existing steel stack.

    Case study

More case studies in this area: BT Inverness, BT Lerwick, Maldron Hotel, Glasgow, Prestwick Airport, Scotway House, Glasgow, Waste treatment site, Glasgow.

Send drawings. Get a price.

Got a flue, chimney or exhaust job in Scotland? Send the drawings. A price normally comes back within 24 hours.