Projects North West

Flue and chimney contractors in the North West

For M&E contractors, main contractors and consultants, anywhere in the UK and Ireland.

Local jobs

Our work in the North West

32 jobs so far, in Preston, Manchester, Blackpool, Barrow-in-Furness, Carlisle and more. Grouped by service below.

Boiler flues

19 jobs. They are on the project map.

About boiler flues

Industrial chimneys and stacks

Five jobs. One is shown here with a photo. The rest are on the project map.

About industrial chimneys and stacks

Other work

Two jobs. Surveys, repairs, supply only and jobs still being classified. They are on the project map.

Coverage

How we cover the North West

Our engineers travel up to the North West from their base in the Midlands. We normally survey within a week of an order. Head office is in Exmouth, Devon. Every job on this page is one our team has delivered in the North West, with the site, town and system shown.

What we did

The work, job by job.

  • Maldron Hotel, Manchester: boiler flue

    Our team delivered the boiler flue at the Maldron Hotel in Manchester. In the plant room, a stainless header runs at high level over the boilers, with a flue rising from each boiler to meet it. The header finishes with an end cap among the copper pipework, and the flue passes through the block wall.

    Case study
  • Trafford Hospital: generator exhausts

    We surveyed and drew both routes in CAD. Each run is a high pressure twin wall insulated system, Ø450 inside, flanged with a gasket at every joint and locked with V bands.

    Case study
  • Barrow Crematorium: cremator flues

    The flues are bespoke, made for this job rather than off the shelf. We designed the flues and support frames and issued drawings for approval before anything was made. The frame is 2 inch box section, made off site and lowered into position under a lifting plan, on feet that sit on the roof. The site supplied the crane, and the customer changed the support method on site.

    Case study
  • Blackpool Hospital: generator exhausts

    The outside work was done from fixed scaffold after a risk assessment. Inside, test points and a flanged horizontal hung on strut channel from the roof steels, out through the wall vent.

    Case study
  • Commercial site, Kendal: boiler flue alteration

    We designed, supplied and installed an altered flue for a 45kW boiler at a commercial building in Kendal. The new flue is an 80/125 concentric system, which takes the flue gas out and brings combustion air in. It has about 3.1 metres of horizontal run and rises about 4.2 metres.

    Case study
  • Currock Community Centre: boiler flue

    Our team delivered the boiler flue at Currock Community Centre in Carlisle. In the photograph: stainless flue liner terminal rising from a stone chimney stack on scaffold during smoke test.

    Case study

More case studies in this area: Delivery office, St Helens, Lever Edge Care Home, Bolton, Preston steam boiler flue, Rodney Street, Birkenhead, Rose Court, Birkenhead, Shankly Hotel, Liverpool, Telephone exchange, Ellesmere Port, Triad Building, Bootle, Waters Meeting Health Centre, Bolton.