At a glance
Biomass flues, in short.
- What it is
- The flue from a biomass boiler to its termination, and the supports, mast or stack that hold it up.
- Scope
- Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.
- Real jobs
- Biomass jobs on our project map in Dartford, Wisbech, Canterbury and Hull.
- Flue rating
- On two of those jobs the twin wall insulated flue was rated for 600°C continuous at 200 Pa.
- Structure
- Free-standing masts designed with the flue, with base loads issued for the foundations.
- Approvals
- We provide the calculations and drawings for building control or chimney height approval. You or your consultant submit the application.
- Price
- Normally within 24 hours of drawings or survey information.
- 24 hours to a price, from drawings or survey information
- 7 days to a survey, normally within a week of order
- 60 minutes to calculations and CAD drawings after survey
- Same day job-specific RAMS, normally
- 2 to 4 weeks from order to install, faster when it is urgent
Normal turnarounds. How we work
What it is
What does a biomass flue package cover?
A biomass flue has to suit the boiler it connects to and find a way through the plant around it. Two of our jobs show what that takes.
At a 2 MW energy centre in Dartford the two 1 MW boilers came with their flanges fitted. We made six bespoke flange adaptors, hung the flues from the roof steels on strut channel, and did the roof work and final weathering ourselves.
- Flue design and sizing calculations
- Twin wall insulated flues
- Bespoke adaptors to suit the boiler outlets
- Supports from the roof steels, strut and brackets
- Free-standing masts with structural calculations
- Roof penetrations, flashings and weathering
- Crane and MEWP lifts under a lift plan
- Flue runs between plant, such as bag filter to fan
Masts and stacks
Can you design the mast as well as the flue?
Yes. At a glasshouse site in Wisbech the flue needed its own free-standing support and the foundations were being built by another contractor, so the base had to be right before any steel arrived.
We designed one Ø400 twin wall insulated flue and one free-standing post mast as a package, with the wind basis written into the design. The base loads, 19.4 kN shear and 148 kNm moment, went to the groundworks team with a twelve-bolt holding-down template before they poured.
The flue and mast went in during one continuous site visit, delivered by HIAB and lifted by crane and MEWP. The flue terminates 14 m up on the 13 m mast. More on this kind of work is on our industrial chimneys and stacks page.
To price it
What we need to price a biomass flue.
Drawings, photos or an outline is enough to start. We price from that or arrange a survey.
- The boilers Type, how many, and output in kW or MW.
- Outlet Size and flange details at the boiler.
- Rough route Vertical and horizontal lengths.
- Termination Roof, wall or mast, and any height already set.
- Structure Building steel, a mast or an existing stack to fix to.
- Foundations Who is building the base, if a mast is needed.
- Site Town or postcode.
Real jobs
Biomass jobs we have done.
Common questions
Asked on biomass jobs.
Anything else, call 01395 201950, email [email protected] or ask Grün AI.
-
Do you install biomass boiler flues?
Yes. Our projects include flues for a 2 MW biomass energy centre in Dartford, a Ø400 biomass flue on a free-standing 13 m mast at a glasshouse site in Wisbech, and flues for a row of biomass boilers on a farm near Canterbury. -
Do you do industrial chimneys and stacks?
Yes. Freestanding chimneys and stacks, guyed stacks and masts, and replacement chimneys for biomass, crematoria and process plant, with insulation, cladding, and cranage and lifting plans. -
Do you handle building control or chimney height approval?
We provide the calculations and drawings needed. The application itself is submitted by you or your consultant. -
Have you worked on farms?
Yes. Our projects include biomass boiler flues on a farm near Canterbury and generator exhausts and silencers at a salmon farm in Applecross. -
How quickly do you send a price?
We normally send a price within 24 hours of getting drawings or survey information. -
Do you do supply only?
Yes. We do supply only, install only, or supply and install. -
What is your lead time?
Normally 2 to 4 weeks from order to install, and faster for urgent jobs.
Send drawings. Get a price.
Drawings, photos or an outline is enough to start. A price normally comes back within 24 hours.
Free survey
Want us to come and look?
Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.