Three twin wall boiler flues with steel support frames on the roof

Services

Commercial boiler flue replacement.

For M&E contractors, main contractors and facilities teams replacing boilers or a failed flue. We take the old flue out, design the new one, install it and test it.

  • Supply only
  • Install only
  • Supply and install

At a glance

Boiler flue replacement, in short.

What it is
Taking out an old or failed boiler flue and fitting a new one, from the appliance to the terminal.
Who it is for
M&E contractors, main contractors, consultants and facilities managers. Commercial and industrial buildings only.
What is included
Survey, calculations, CAD drawings, job-specific RAMS, strip-out, supply, install, testing and the handover pack.
Price
Normally within 24 hours of drawings or survey information.
Lead time
Normally 2 to 4 weeks from order to install, faster for urgent jobs.
Testing
A smoke test is standard on every flue we install. Pressure testing where it is in the quote.
  • 24 hours to a price, from drawings or survey information
  • 7 days to a survey, normally within a week of order
  • 60 minutes to calculations and CAD drawings after survey
  • Same day job-specific RAMS, normally
  • 2 to 4 weeks from order to install, faster when it is urgent

Normal turnarounds. How we work

What it is

When does a boiler flue need replacing?

Most replacement jobs start one of two ways. Either the boilers are being replaced and the old flue no longer suits the plant, or the flue itself has failed: leaking joints, corrosion, broken-down insulation or brackets that have let go.

New plant rarely lines up with the old flue. At Halesowen College the existing flues were leaking, so we took them out and drew a new header arrangement for each plant room.

We size the new flue ourselves and check the design against the current regulations. You don’t need to work out sizes or heights.

  • Survey of the existing flue and route
  • Flue sizing calculations and CAD drawings
  • Strip-out and disposal of the old flue
  • New headers, risers and terminals
  • Supports, flashings and weathering
  • Towers, scaffold or MEWPs where quoted
  • Smoke test and certificate of conformity
  • O&M pack at handover

Live buildings

Can the heating stay on while the flue is replaced?

Often, by phasing the work. At DVLA in Swansea three 2.5 MW boilers needed replacement flues and the boiler house had to keep running, so we took the old flues out and fitted the new ones in two phases.

At The Queens Hotel in Leeds we put in a temporary flue for the changeover and pressure tested it.

Our standard site hours are 08:00 to 16:30, Monday to Friday. Nights and weekends are by arrangement. Tell us what has to stay on when you send the enquiry.

To price it

What we need to price a flue replacement.

Photos of the existing flue and the boiler details are enough to start. We price from that or arrange a survey.

Send what you have
  1. The boilers Type, how many, and output in kW. Old and new if the plant is changing.
  2. Spigot sizes Diameter at each appliance.
  3. The existing flue Photos of the header, the riser and the terminal.
  4. Rough lengths Vertical and horizontal runs.
  5. Chimney or flue Whether it runs in an existing chimney, and what is there now.
  6. What must stay on Any boilers that have to keep running during the work.
  7. Site Town or postcode.

Common questions

Asked on replacement jobs.

Anything else, call 01395 201950, email [email protected] or ask Grün AI.

  • How quickly can you price a boiler flue replacement?

    We normally send a price within 24 hours of getting drawings or survey information. Photos of the existing flue and the boiler details are enough to start.
  • Do you strip out the old flue?

    Yes. Strip-out of old flues is part of our boiler flue packages, and old liner removal and strip-out is part of our chimney work.
  • Can the boilers keep running while you replace the flue?

    Often, by phasing the work. At DVLA in Swansea we took the old flues out and fitted the new ones in two phases so the boilers could keep running, and at The Queens Hotel in Leeds we put in a temporary flue for the changeover. Tell us what has to stay on when you enquire.
  • Can the existing chimney be reused?

    Often, yes. We can line an existing chimney or plan a new stack, depending on the survey and the appliance. Our guide Can my old chimney be used? explains how we decide.
  • Do you install the boilers?

    No. We do the flue, chimney and exhaust, not the boiler or generator itself. We design, supply, install and test the flue systems for boilers, generators, CHP, water heaters and industrial plant.
  • What is your lead time?

    Normally 2 to 4 weeks from order to install, and faster for urgent jobs.
  • What testing and paperwork do I get?

    A smoke test is standard on every flue we install, and pressure testing is done where it’s in the quote. You get calculations, drawings, job-specific RAMS, daily photo reports, test reports, a completion report with photos and an O&M pack.

Send drawings. Get a price.

Drawings, photos or an outline is enough to start. A price normally comes back within 24 hours.

Free survey

Want us to come and look?

Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.