Stainless twin wall flue rising from the back of a large steam boiler and running along the wall at high level

Services

Steam boiler flues and vent stacks.

Flues for steam boilers, and the vent and discharge stacks that go with them, on factory, laboratory and process sites. Designed, supplied, installed and certified.

  • Supply only
  • Install only
  • Supply and install

At a glance

Steam boiler flues, in short.

What it is
The flue from a steam boiler to its terminal, and the vent and discharge stacks from the boiler house.
Scope
Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.
Real jobs
Steam boiler jobs on our project map in Preston, Glasgow, Oxford and Derby.
How we have done it
On each of those jobs every steam boiler has its own flue or stack. The flues are twin wall insulated, Ø300 on two of the jobs.
Who it is for
M&E contractors, main contractors, consultants and site engineering teams.
Price
Normally within 24 hours of drawings or survey information.
Lead time
Normally 2 to 4 weeks from order to install, faster for urgent jobs.
  • 24 hours to a price, from drawings or survey information
  • 7 days to a survey, normally within a week of order
  • 60 minutes to calculations and CAD drawings after survey
  • Same day job-specific RAMS, normally
  • 2 to 4 weeks from order to install, faster when it is urgent

Normal turnarounds. How we work

What it is

What does a steam boiler flue job cover?

We size the flue ourselves, draw the route in CAD and install it with our own engineers. On the steam boiler jobs we have done, each boiler has its own flue.

At a commercial site in Preston a Ø300 twin wall insulated flue rises off the back of the steam boiler, runs about 4.5 metres at high level and leaves through the side wall. Outside it climbs the cladding on wall brackets to finish 1 metre above the eaves, with a flashing plate where it passes through the wall.

At a waste treatment site in Glasgow two steam boilers have separate Ø300 flues. Each has a soot collector and drain at the base of the stack and an open terminal with a mesh guard 3 metres above the roof. We supplied and fitted the combustion air ducting too.

  • Site survey, flue calculations and CAD drawing
  • A separate flue for each steam boiler
  • Twin wall insulated flues
  • Soot collectors and drains at the base of the stack
  • Wall brackets, supports and fixings
  • Roof and wall penetrations with flashing plates
  • Vent and discharge stacks
  • Combustion air ducting

Vent stacks

Do you replace steam boiler vent stacks?

Yes. At a factory in Derby we took out the old vent pipework from a steam boiler house and replaced it like for like: a 5 inch stack for each of the two small boilers, a 6 inch stack for the large boiler and a 6 inch stack outside.

The pipework is carbon steel, flanged and fully welded, with a weatherproof coating. Each boiler stack is supported so the bottom section can come off for maintenance, and finishes in a bird beak terminal with mesh. The outside stack has a weather hood that drains back into the pipe below it.

At a university research building in Oxford the steam plant shares the building with other appliances: two steam boilers each have their own flue beside a boiler header, the water heater flues and a standby generator exhaust, all designed and installed as one job.

To price it

What we need to price a steam boiler flue.

Drawings, photos or an outline is enough to start. We price from that or arrange a survey.

Send what you have
  1. The boilers Type, how many, and output.
  2. Outlet size Diameter at each boiler.
  3. Rough route Vertical and horizontal lengths.
  4. Termination Roof or wall, and any height already set.
  5. Vent stacks Whether vent or discharge pipework is part of the job.
  6. What is there now Photos of any existing flue or stack.
  7. Site Town or postcode.

No photo yet

One more, without photos.

Common questions

Asked on steam boiler jobs.

Anything else, call 01395 201950, email [email protected] or ask Grün AI.

  • Do you install steam boiler flues?

    Yes. Our projects include steam boiler flues at a commercial site in Preston, a waste treatment site in Glasgow and a university research building in Oxford, and replacement vent stacks for a steam boiler house in Derby.
  • Who works out the flue size?

    We do. We do the calculations and check the design against the current regulations. You don’t need to work out sizes or heights yourself.
  • Do you handle building control or chimney height approval?

    We provide the calculations and drawings needed. The application itself is submitted by you or your consultant.
  • Do you work on industrial sites?

    Yes. Oven, furnace, steam boiler and biomass flues, industrial stacks and process exhaust. Production lines run on shifts and shutdowns are short, so nights and weekends are by arrangement.
  • How quickly do you send a price?

    We normally send a price within 24 hours of getting drawings or survey information.
  • Do you do supply only?

    Yes. We do supply only, install only, or supply and install.
  • What is your lead time?

    Normally 2 to 4 weeks from order to install, and faster for urgent jobs.

Send drawings. Get a price.

Drawings, photos or an outline is enough to start. A price normally comes back within 24 hours.

Free survey

Want us to come and look?

Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.