At a glance
Grün in Derby
- Jobs on the map
- 13 in Derby
- Kinds of job
- Four boiler flue jobs, one generator exhaust job, five industrial chimney and process jobs and three other jobs
- Sites include
- Rolls-Royce PTF Building, 4no steam boilers, Duffield Bank House and Rolls-Royce EOS Building
Real jobs
Derby jobs with photos.
What we did
The work, job by job.
-
Rolls-Royce PTF Building: oven flues
Separate flues for four ovens in the PTF building at a factory site in Derby. Each flue rises straight up through the roof and finishes with a horizontal bird beak terminal with mesh.
Case study -
4no steam boilers: steam boiler vent stacks
New vent and discharge stacks for the steam boilers at a factory in Derby. We took out the old vent pipework and replaced it like for like. There are four systems: a 5 inch stack for each of the two small boilers, a 6 inch stack for the large boiler and a 6 inch stack outside. The pipework is carbon steel, flanged and fully welded, with a weatherproof coating.
Case study -
Duffield Bank House: boiler flues
New flues for two 140 kW boilers at Duffield Bank House in Derby. We took the old flue out of the plant room and re-routed it to the back wall, rising 1 m above the roof.
Case study -
Rolls-Royce EOS Building: water heater flue
A new flue for a water heater in the EOS Building at a factory site in Derby. Twin wall insulated flue, Ø100 inside, rising to the roof.
Case study -
Rolls-Royce Rotatives: furnace exhaust survey
Survey notes, a site report and a furnace flue analysis for plasma nitriding furnaces at a factory site in Derby. The report set out how the furnace exhaust could be treated and vented safely.
Case study -
Rolls-Royce Rotatives: oven flue extension
An extension to the flue on a single oven at a factory site in Derby. Twin wall insulated flue, Ø150, rising about 10 m with two elbows.
Case study -
Rolls-Royce Rotatives: flue flashing reseal
Remedial work to reseal the flashings around flue terminals on a factory roof in Derby.
Case study -
Rolls-Royce Rotatives: air handling unit flue
A new Ø350 twin wall insulated flue for an air handling unit at a factory site in Derby, with the old one stripped out. It rises from the unit on a floor-standing support frame.
Case study
- 4no steam boilersIndustrial chimney or process exhaust
- Duffield Bank HouseSurvey, repair, supply only or not yet classified
- Factory, DerbyBoiler flue
- Factory, DerbyIndustrial chimney or process exhaust
- Rolls-Royce 9016 Building, DerbyIndustrial chimney or process exhaust
- Rolls-Royce EOS Building, DerbySurvey, repair, supply only or not yet classified
- Rolls-Royce EOS Building, DerbyBoiler flue
- Rolls-Royce PTF Building, DerbyIndustrial chimney or process exhaust
- Rolls-Royce Rotatives, DerbySurvey, repair, supply only or not yet classified
- Rolls-Royce Rotatives, DerbyIndustrial chimney or process exhaust
- Rolls-Royce Rotatives, DerbyBoiler flue
- Rolls-Royce Rotatives, DerbyBoiler flue
- Rolls-Royce production hall, DerbyGenerator exhaust
Coverage
How we cover Derby.
Our engineers are based in the Midlands, so Derby is close to where they start from. We normally survey within a week of an order.
The work we have done in Derby is covered on our boiler flues, generator exhausts and silencers and industrial chimneys and stacks pages. Other jobs in the region are on the Midlands page.
Common questions
Asked about Derby.
Anything else, call 01395 201950, email [email protected] or ask Grün AI.
-
Do you do commercial flue work in Derby?
Yes. Our project map has 13 jobs in Derby: four boiler flue jobs, one generator exhaust job, five industrial chimney and process jobs and three other jobs. Sites include Rolls-Royce PTF Building, 4no steam boilers and Duffield Bank House. We work across the UK and Ireland. -
What is an example of your work in Derby?
Rolls-Royce PTF Building, Derby. Separate flues for four ovens in the PTF building at a factory site in Derby. Read the case study.
Got a job in Derby?
Send the drawings. A price normally comes back within 24 hours.