How to choose a commercial flue contractor

Ten things to check before you place a flue order, and what to ask for as proof. For M&E contractors, main contractors and facilities managers. It applies to any contractor, us included.

Short answer

What should you check?

Check that the contractor is pre-qualified and insured, that they do their own design to a stated standard, that you see drawings and job-specific RAMS before work starts, that the flue is tested with the result on paper, and that you know what the handover pack will contain.

Then ask for jobs like yours, with the site, the town and photos. A contractor who has done the work can show it.

The checklist

Ten checks, and what to ask for.

  1. Accreditations

    Ask which pre-qualification and health and safety schemes they hold, with certificate numbers and expiry dates. Constructionline checks a company and its policies. SSIP schemes such as SafeContractor and Once For All assess health and safety. Check the numbers with the scheme.

  2. Insurance

    Ask for the limits and end dates of employer’s liability, public and products liability and professional indemnity cover. Professional indemnity matters when the contractor is doing the design.

  3. Who does the design

    Ask who sizes the flue and which standards the calculations follow. Ask to see a sample calculation. If the contractor expects you to supply sizes and heights, the design risk is staying with you.

  4. Drawings before the work

    Ask for CAD drawings for approval before materials are ordered: the route, the supports, the penetrations and the terminal. Ask how long they take after a survey.

  5. RAMS for your job

    Ask for RAMS written for your site and your job, and ask to see a sample first. Access, lifting and work at height should be about your roof and your plantroom.

  6. Who turns up

    Ask whether the install is by the contractor’s own engineers, who runs the job on site, and what training they hold. On sites that need DBS checks or inductions, ask early.

  7. Testing

    Ask what testing is included in the price and what is extra. A smoke test and a pressure test are different things. Ask what you get on paper afterwards.

  8. Handover paperwork

    Ask what is in the handover pack and when it arrives: test reports, a certificate of conformity where applicable, a completion report with photos and an O&M pack. Ask for a sample.

  9. Scope

    Ask exactly what is in the flue contractor’s scope and what is left to others: strip-out, access, builders’ work, fire stopping, roof weathering, and connecting and commissioning the appliance.

  10. Proof and warranty

    Ask for similar jobs you can look up, and for turnaround times in writing. Ask how long the workmanship warranty runs and what you have to do to keep it.

At a glance

How does Grün answer these?

Accreditations
Constructionline Gold (1400487), SafeContractor (NR5256), Once For All SSIP (1400487). Certificates.
Insurance
Employer’s liability £10 million, public and products liability £5 million, professional indemnity £2 million.
Design
We do the calculations. They follow BS EN 13384, and where relevant BS 6644, IGEM/UP/10 and Building Regulations Part J.
Drawings
CAD drawings normally within 60 minutes of the survey.
RAMS
Written for the job and site, normally the same day. Sample RAMS.
Who turns up
Our own engineers, with a Grün project manager on site. CSCS, IPAF, PASMA, SSSTS, asbestos awareness, DBS where needed.
Testing
A smoke test is standard on every flue we install. Pressure testing where it is in the quote.
Handover
Test reports, certificate of conformity where applicable, completion report with photos and O&M pack. Sample pack.
Scope
Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work. Each quote lists what is included and excluded.
Proof and warranty
317 jobs on a public project map: all delivered. Jobs won or on site now are on our news page. 12 months on workmanship, registered within 30 days of practical completion.

Common questions

Asked when choosing a contractor.

Anything else, call 01395 201950, email [email protected] or ask Grün AI.

  • What accreditations should a commercial flue contractor have?

    Ask for a supply chain pre-qualification such as Constructionline and an SSIP health and safety assessment such as SafeContractor or Once For All, then check the certificate numbers and dates. Ours are on the accreditations page.
  • What paperwork should I get at the end of a flue job?

    Test reports, a certificate of conformity where applicable, a completion report with photos and an O&M pack with system details, drawings, test reports and maintenance guidance. Our guide to flue handover paperwork goes through each one.
  • What should I send to get prices I can compare?

    Send every contractor the same things: appliance type and how many, output in kW or kVA, spigot or outlet sizes, rough vertical and horizontal lengths, whether it is a new flue or an existing chimney, the termination and the site location. Ask each one to list what is included and excluded.
  • Is the cheapest flue quote the best one?

    Compare what each quote includes before you compare the totals. Check whether strip-out, access, testing, fire stopping and the handover pack are in the price or left out.
  • Will Grün price against our usual supplier?

    Yes. We’re happy to price as a comparison against your usual supplier.

Put us through the checklist.

Send drawings, photos or an outline. A price normally comes back within 24 hours.