At a glance
Water heater flues, in short.
- What it is
- The flue from a gas water heater to its terminal, with the header, supports, drain and roof details.
- Scope
- Commercial and industrial only. We do the flue, chimney and exhaust, not the boiler or generator itself, and not domestic work.
- How we have done it
- On the jobs shown here the water heaters have their own flue or their own header, separate from the boiler header.
- With the boilers
- Boiler and water heater flues are designed, drawn and installed together as one package.
- Who it is for
- M&E contractors, main contractors, consultants and facilities managers.
- Price
- Normally within 24 hours of drawings or survey information.
- Lead time
- Normally 2 to 4 weeks from order to install, faster for urgent jobs.
- 24 hours to a price, from drawings or survey information
- 7 days to a survey, normally within a week of order
- 60 minutes to calculations and CAD drawings after survey
- Same day job-specific RAMS, normally
- 2 to 4 weeks from order to install, faster when it is urgent
Normal turnarounds. How we work
What it is
Does a water heater need its own flue?
On the jobs shown here, yes: the water heaters have their own flue or share a header with each other, and the boilers have theirs. We work out what suits your plant in the calculations, so you don’t need to decide that yourself.
At the Maldron Hotel in Glasgow two water heaters connect with Ø180 primaries into a Ø350 header, beside a separate Ø180 header for two condensing boilers. At Red Hill Primary School in Worcester three boilers share a Ø200 header and the water heater has its own Ø100 flue, both running about 8 metres up the outside of the building.
- Flue sizing calculations and CAD drawing
- A single flue for one water heater
- A shared header for several water heaters
- Boiler flues in the same package
- Drain tees for condensate
- Supports on strut, drop rods and wall brackets
- Roof terminals and flashings
- Smoke test and certificate of conformity
On its own
Can you flue a single water heater?
Yes. There is no minimum job size, as long as it is commercial or industrial work.
At a distribution centre in Nuneaton a single 71kW water heater connects to a Ø130 twin wall insulated flue. It runs about 7 metres at high level and rises about 7 metres, past a mezzanine floor, to a terminal on the profiled metal roof. A drain tee at the base of the riser takes the condensate away.
At Peckham Rye in London two water heaters share a 150mm header that runs about 8 metres across and rises about 16 metres up a service riser to the roof. The installation was smoke tested and passed.
To price it
What we need to price a water heater flue.
Drawings, photos or an outline is enough to start. We price from that or arrange a survey.
- The water heaters Type, how many, and output in kW.
- Spigot size Diameter at each appliance.
- Other plant Any boilers being flued at the same time.
- Rough route Vertical and horizontal lengths.
- New or existing New flue, or what is there now.
- Termination Roof or wall.
- Site Town or postcode.
Real jobs
Water heater jobs we have done.
Common questions
Asked on water heater jobs.
Anything else, call 01395 201950, email [email protected] or ask Grün AI.
-
Do you install water heater flues?
Yes. Flues for gas and condensing boilers, water heaters and CHP: single appliances, cascades into common headers and complete plantroom replacements, designed, supplied, installed and tested. -
Can the water heater share the boiler flue?
On the jobs shown on this page the water heaters have their own flue or their own header, separate from the boiler header. We work out what suits your plant in the calculations. -
Is there a minimum job size?
No. There’s no minimum job size, as long as it’s commercial or industrial work. -
What testing do you do?
A smoke test is standard on every flue we install. Pressure testing is done where it’s in the quote or added as a variation, so tell us if your spec needs it. -
How quickly do you send a price?
We normally send a price within 24 hours of getting drawings or survey information. -
Do you do supply only?
Yes. We do supply only, install only, or supply and install. -
What is your lead time?
Normally 2 to 4 weeks from order to install, and faster for urgent jobs.
Send drawings. Get a price.
Drawings, photos or an outline is enough to start. A price normally comes back within 24 hours.
Free survey
Want us to come and look?
Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.