At a glance
CHP flues, in short.
- What it is
- The flue that takes the exhaust from a combined heat and power unit to outside.
- How we have done it
- On every CHP job on our project map the CHP unit has its own twin wall insulated flue, separate from the boiler header.
- Who it is for
- M&E contractors, main contractors, consultants and facilities managers. Commercial and industrial buildings only.
- Testing
- Pressure tested where the spec asks for it. One hotel CHP flue was tested at 3,000 Pa for 15 minutes and passed.
- Price
- Normally within 24 hours of drawings or survey information.
- Lead time
- Normally 2 to 4 weeks from order to install, faster for urgent jobs.
- 24 hours to a price, from drawings or survey information
- 7 days to a survey, normally within a week of order
- 60 minutes to calculations and CAD drawings after survey
- Same day job-specific RAMS, normally
- 2 to 4 weeks from order to install, faster when it is urgent
Normal turnarounds. How we work
What it is
What does a CHP flue package cover?
A combined heat and power (CHP) unit is an engine that makes electricity and useful heat at the same time. On our jobs it has shared a plantroom with boilers or water heaters, and once with a standby generator too, so its flue was planned with theirs.
We size the CHP flue from the unit’s data, draw it in CAD with the other flues, and install and test the lot as one package. It all comes from one team under one order.
- Flue sizing calculations and CAD layout
- A separate flue for the CHP unit
- Boiler, water heater and generator flues in the same package
- Supports up risers and through roof voids
- Roof terminations, storm collars and weathering
- Pressure test and certificate of conformity
- O&M pack at handover
Real jobs
How have CHP flues gone in on real jobs?
At Cleveland Street in Fitzrovia a 90kW CHP unit has its own Ø100 flue beside a Ø350 header for three 468kW boilers and a separate insulated exhaust for a 220kVA standby generator. All three run about 14 to 15 metres across the plant room, then rise about 35 metres up a shared riser.
At Hampton by Hilton in Aldgate the CHP has its own Ø100 flue and three water heaters share a header. Both systems run about 24 metres up the building in twin wall insulated flue rated for four hours in a fire. The CHP flue was pressure tested at 3,000 Pa for 15 minutes and passed.
At Eastcote Care Home in Solihull a small CHP unit has its own Ø100 flue beside the Ø200 boiler header, and both pass through the flat roof on weathered flashings. At a new care home in Bedhampton the Ø100 CHP flue is held on strut across the timber joists in the roof void and finished in grey above the tiles.
To price it
What we need to price a CHP flue.
Drawings, photos or an outline is enough to start. We price from that or arrange a survey.
- The CHP unit Make, model and output.
- Exhaust data Flow, temperature and the back pressure limit from the datasheet.
- Outlet size Diameter at the unit.
- Other plant Boilers, water heaters or generators sharing the plantroom or riser.
- Rough route Vertical and horizontal lengths.
- Termination Roof or wall, and any height already set.
- Site Town or postcode.
Real jobs
CHP jobs on our project map.
Common questions
Asked on CHP jobs.
Anything else, call 01395 201950, email [email protected] or ask Grün AI.
-
Do you install CHP flues?
Yes. We design, supply, install and test flues for CHP units, on their own or with the boiler, water heater and generator flues in the same plantroom. Our project map has CHP jobs in Fitzrovia, Aldgate, Solihull and Bedhampton. -
Does the CHP need its own flue?
On every CHP job on our project map the CHP unit has its own flue, separate from the boiler header. We work out what suits your plant in the calculations, so you don’t need to decide that yourself. -
What do you need to price a CHP flue?
The unit’s data, meaning exhaust flow, temperature and the back pressure limit, plus a rough route. Drawings, photos or an outline is enough to start, and a price normally comes back within 24 hours. -
Do you pressure test CHP flues?
Pressure testing is done where it’s in the quote or added as a variation, so tell us if your spec needs it. On a hotel job in Aldgate the CHP flue was pressure tested at 3,000 Pa for 15 minutes and passed. -
Do you do supply only?
Yes. We do supply only, install only, or supply and install. -
What is your lead time?
Normally 2 to 4 weeks from order to install, and faster for urgent jobs. -
What warranty do you give?
12 months on our workmanship, plus the manufacturer’s warranty on the materials. No inspection is needed in the first year, but the installation must be registered within 30 days of practical completion.
Send drawings. Get a price.
Drawings, photos or an outline is enough to start. A price normally comes back within 24 hours.
Free survey
Want us to come and look?
Free for commercial and industrial projects. We’ll call to confirm the details and the date before anything is booked.